Project Overview:
Structural engineering from foundations through podium level, including reinforced concrete frame design, transfer structures, light gauge steel frame superstructure coordination, detailed Revit modelling, reinforced concrete detailing, temporary works and sitewide below ground drainage.
The Challenges:
The Limes required a structural solution which included a transfer slab under the accommodation blocks capable of supporting a multi-storey light gauge steel frame (LGSF) superstructure and a reinforced concrete podium slab under the communal landscaped areas, while accommodating a modular parking area below.
The transfer slab design became critical. These weren’t straightforward floor slabs, they needed to efficiently distribute loads from the LGSF above into the concrete columns below, all while working within the architectural layout and focusing on buildability.
The site itself also added another layer of complexity. Neighbouring boundaries and the construction sequencing meant we had to think carefully about temporary works and how the site would be accessed during construction.
During construction the discovery of existing services routes and design modifications meant changes to the structural design which had to be accommodated. This involved additional piling, wall geometry changes and changes to reinforcement detailing. These challenges had to be met with the overall structural strategy remaining consistent and without alteration to the project timeline.
T&G’s Approach:
We worked from a detailed Revit-based workflow from the outset. This proved essential, both for the initial coordination and for managing design changes through construction.
The reinforced concrete frame and transfer structures were modelled in detail to verify load transfer between the transfer slab and podium deck to the columns and foundation. Working with the design team, the model became a reference for coordination throughout the project.
Coordination in Practice:
Successful delivery came down to close collaboration across multiple parties. The client, architects, contractor, infrastructure consultants, and Hadley (the LGSF supplier) all needed to work together.
Our Revit model served as the central reference point. This improved communication between disciplines and enabled design reviews that reflected what was being built. When questions arose about clashes or constructability, the model was there to interrogate.
For more information on T&G’s engineering solutions for this project or to discuss your own engineering enquiries, contact Tom McCarthy at [email protected], call 01534 867070, or visit www.tag.je.
The T & G team behind the
Creation of The Limes

Why choose T & G?
Over more than 30 years in business, we have been involved in projects across the Channel Islands, spanning every type of construction, working on large commissions and small, encompassing the requirements of private and public sector clients. Each has been approached with the same determined, creative professionalism that drives everything T&G does.
Choosing to work with T&G in Guernsey or Jersey provides assurance of the same high quality approach. We take pride in understanding and meeting client requirements, in finding solutions to engineering challenges and ensuring satisfaction at the completion of every project or piece of work.